The maintenance cycle of downhole tools varies according to usage and type. The following are the maintenance cycles of several common downhole tools:
MFE formation testing tool:
Routine maintenance: Routine maintenance is performed after each use or after being placed for three months.
First maintenance: Once every three times down the well or after being placed for six months.
Second maintenance: Once every six times down the well or after being placed for twelve months.
Repair: Appraisal and repair are performed in case of downhole accidents or ground accidents, and overhaul is performed after twelve uses.

Drilling desilter:
On the day of use: Check the inlet pressure and small hole cleanliness, lubricate the desander pump and desilter pump packing, and check the inner surface wear of the wear-resistant rubber cone bushing.
After 100 days of use: Grease the backrest wheel.
After two years of use: Check the impeller, pump casing and water supply and discharge butterfly valves of the sand pump, and replace the impeller, pump casing or butterfly valve rubber if necessary; disassemble and inspect the bearings and seals of the sand pump, and update them if necessary; check the conical bushings and components of the hydrocyclone, and replace them if necessary.
Drilling rig:
Check the oil quantity and quality of each oil tank, check the oil quantity and quality of each reducer gear, check the main and auxiliary wire ropes and lifters, check the steel structure, etc. These inspections and maintenance are usually carried out after each use.

